Friday, 4 January 2013

Lampeter Library Refurbishment

The final phase of the refurbishment is about to commence and we hope that work will be completed by the end of January.  While work is being carried out we will need to close the study space on the lower floor  for health and safety reasons, so  please use space on the upper floor and the mezzanine or the quiet study rooms (Cyril Williams Room/Research Postgraduate Room).

The whole of the lower floor will be closed to customers between 7/1/2013 and 12/1/2013 so that shelving can be assembled and books and journals can be moved.  If you require a book or journal issue from the lower floor please ask at the Information Point where LRC staff will be pleased to assist you.

Thank you for your co-operation and patience.

No comments: